Bisotoun power plant has been installed for providing the electric Trans network requirement in the west of country ( Kermanshah,Kordestan,and Ilam ).This plant is located between Kermanshah(20 Km distant ) and Bisotoun(8Km distant) and it contains two steamy units whose capacity is 320 megawatt,main fuel of unit’s boiler is natural gas and heavy fuel oil used as a second fuel. Boiler and unit’s turbine are made in Italian Franco – Tosi Company and unit’s generators are made in Italy Ansaldo Company Westinghouse design.
Needed water is pumped by 3 fehlman wells which are located at 6 kilometers of power plant & in adjacent to Gamasiab River , the capacity of these wells is generally 2000 cubic meter per hour and is transferred to power plant by the pipe. Each of units in perfect charge has the average amount of consumed fuel which is equal to 84KNM3/H of gas and 75 TON/H of Must and the degree of consumption of water, in every perfect charge,is 500 M3/H which this amount is different according to the temperature in different seasons.
Operation of the erection and start up the plant was started by Italian contractor and with cooperation of the internal contractors since Farvardin 1370 and finally in the first time, first and second units were paralleled in Transmission network in turn on 17th Khordad and 5th Aban 1370.
|